March 6

Replacing Existing Dock With Boathouse On Lake Concord

0  comments

In 2016, Fender Marine Construction, Orlando’s premier Marine Contractor, was hired to build this boathouse and covered activity deck. The existing dock did not have a boathouse, but did have an old terminal platform that burned down. Further, the existing dock was built encroaching into the side setback of the property. Fender Marine Construction prepared the engineered drawings, procured all the proper permitting, demolished the existing dock and constructed this beautiful and functional top of the line boathouse and covered activity deck. The marine construction project features Ipe Brazilian hardwood decking, Heavy pressure treated Pine open Beam ceiling with 2″x6″ Tongue and Groove V-Joint roof decking and barrel tile roofing. Fender Marine Construction provides the very finest in residential and commercial marine projects.

Dock Before:                                                               

Dock Demolition:

Boathouse And Dock Pile Set:

Boathouse Roof Framing:

Boathouse Dual PWC Lift:

Boathouse Ceiling:

Completed Boathouse And Activity Deck:

From retaining walls, docks and boathouses, our team at Fender Marine Construction can help with any project in the central Orlando area.

Contact us today for more information. 407-481-2750

 

 


Tags


You may also like