Featured Project Hacienda Village Pedestrian and Golf Cart Bridge

Fender Marine Construction was hired by The Hacienda Village HOA to demolish and reconstruct their Pedestrian and Golf Cart Bridge. The project was originally designed by an engineer with limited experience in marine construction projects and the original bids came in over budget. Fender Marine Construction was hired by the HOA to perform the project as a design-build to save money and make the project stronger with greater longevity. The project features heavy pressure treated Southern Yellow Pine pile that were driven into position, heavy timber bents, heavy glulam pressure treated Pine joists with clear spans over the creek. All the permitting and engineering was handled by Fender Marine Construction and their consultants. We applaud our skilled in-house craftsman for their dedication in bringing this project to a beautiful successful completion.

  • Hacienda Village