Nickelodeon Walkway

The Nickelodeon Holiday Inn in Orlando needed to add onto their steel and concrete walkway over the existing retention pond. Fender Marine Construction was selected to build the guest and time sensitive project. The steel for the Click to Return to the Commercial Projects deck was prefabricated and then hot dip galvanized in order to prevent rust in this wet environment. The piling consisted of a PVC shell with a 12' steel reinforced concrete center. The actual decking was poured in place concrete with a "cool deck" finish. A beautiful "Sunbrella" canopy topped the project.